{ "@context" : "http://schema.org/", "@type" : "Product", "name" : "Runtime; IEC60870 Slave; Single License; Online activation", "description" : "<b>Function:</b><br/>The parameters for communication per the IEC 60870 protocol can be set with a configurator that is integrated into the <b><i>e!</i></b><i>COCKPIT</i> Software. <br/>The configurator sets up IEC 60870 objects, while configuring data exchange to the PLC application or I/O modules. Importing and exporting functions in a CSV format allows configured data to be transmitted to other engineering tools.<br/>With this license, the protocols IEC 60870-5-101 and -104 can be activated on the slave, and the protocol -103 activated on the master only. This permits the creation of gateways that convert one protocol into another, e.g., allowing protection devices to be read out via IEC 60870-5-103 and data to be transmitted to the network control system via IEC 60870-5-104.<br/>The time on the telecontrol substation (slave) can be directly synchronized via either the IEC 60870 protocol with object 103 or via (S)NTP. <br/>IEC 60870-5-101/-104 information objects can be used to monitor the direction of single, double and step messages – bit patterns, counter values, as well as normalized, scaled and floating point measurement values can also be used. All information objects can be transmitted with or without a time stamp. This also applies to information objects in the control direction.<br/><br/>An IEC 60870-5-104 slave can simultaneously maintain up to four connections to the control system (master).<br/><br/><b>Your Benefits:</b><br/><ul><li>Use of the PFC200 Controller as a telecontrol substation (slave) on an IEC 60870-5-101/-104 control system (master) </li><li>Processing data from one or more IEC 60870-5-103 protection devices (slaves) with the PFC200 controller (master)</li><li>Creation of a gateway application to transfer data from IEC 60870-5-103-protective devices to an IEC 60870-5-101/-104 control system. </li></ul><br/><br/><b>Use:</b><br/>Enter the license into <b><i>e!</i></b><i>COCKPIT</i>, assign it to a device and load both the license and project into the controller. No other steps are required.<br/><br/><b>Technical Data:</b><br/>See Section “Functionality of the WAGO Protocol Library according to IEC 60870-5-101, and -104” in Product Manual “Planning DNP3 / IEC 60870 with the Telecontrol Configurator and <b><i>e!</i></b><i>COCKPIT</i>.”", "mpn" : "2759-290/211-1000", "sku" : "2759-290/211-1000", "brand" : { "@type":"Brand", "name":"WAGO" }, "manufacturer" : { "@type":"Organization", "name":"WAGO Kontakttechnik GmbH & Co. KG" }, "image" : "https://www.wago.com/medias/200-3061721-DE.jpg?context=bWFzdGVyfGltYWdlc3wxMzA4fGltYWdlL2pwZWd8YURRekwyaGtNUzh4TXpnd01EazVNRGN6TmpReE5DOHlNREJmTXpBMk1UY3lNVjlFUlM1cWNHY3wzN2E4NTgxMmNjNGMyYTgxNmY5NzdmMzUyMWUxNzFjNThkMWM5NWZhNDljZjc2MGY3NDk4NTY2YTQ4N2U4NmIy", "gtin13" : "4066966054248", "category" : "Software", "url" : "https://www.wago.com/es/software/runtime/p/2759-290_211-1000" }
[ { "id": "details", "label":"Detalles", "priority": 100 }, { "id": "downloads", "label":"Descargas", "priority": 90 } ]