Efficient Construction with Pluggable Electrical Installation

At the beginning of 2019, Dissen am Teutoburger Wald commissioned the construction of a day care center and kindergarten. The challenge: The first two groups were already scheduled to start in early summer. For the construction period of only 12 weeks, the electrical engineers relied on the time-efficient WINSTA® Pluggable Connection System from WAGO.
Kindergarten spots are scarce in Germany and urgently needed. Dissen in Lower Saxony is facing this problem as well: According to the Cologne Institute for Economic Research, there is a shortage of 30,500 day care spots in Lower Saxony alone.
To ease the tense day care availability situation for communities and families as quickly as possible, Dissen commissioned the construction of a day care center and kindergarten at the beginning of 2019. Assuming conventional construction methods, the planners expected a construction time of three quarters to one year, which was far too long for many parents, the city of Dissen and the developer, Charly’s Kinderparadies. It was clear to Heinrich Mackensen, the first chairmen of the trustee organization, that conventional construction methods would not suffice for a tighter construction deadline. The solution: two wood-frame buildings and pluggable electrical installation with WINSTA® from WAGO.
The Benefits for You:
Minimal installation time through optimal planning with a pre-assembled system solution
Protection against mismating with appropriate pre-assembled cables and standard components
Straightforward connection to electrical components such as sockets and lights by WINSTA® system partners