[ { "uid": "link_contact", "linkName": "Contact", "url": "/sg/contact#wago-support-contact-anchor", "target": "_self", "classAttributes": "phone" } ] [{"term":"Libraries_BA","id":0,"type":"QUICKLINKS"},{"term":"Instructions","id":1,"type":"QUICKLINKS"},{"term":"WAGO-I/O-PRO","id":2,"type":"QUICKLINKS"},{"term":"Building","id":3,"type":"QUICKLINKS"},{"term":"221","id":4,"type":"QUICKLINKS"}]

75 percent procurement costs, up to 75 time savings: The WAGO marking system allows you to mark all planned items directly from the project design tool. Minimize time and errors with automatic transfer of printing data from the CAE tool!

Professional and Standards-Compliant: smartPRINTER

The smartPRINTER is WAGO’s thermal transfer printer, which you can use for printing marking strips, plates and labels for all WAGO terminal blocks, as well as for marking conductors, cables and devices.

The printing capacity and product features speak for themselves:

  • Low purchase costs
  • Easy installation
  • Highly versatile
  • No drying time – can be used immediately
  • Durable processing, smear and scratch-resistant
beschriftung_2000x1500px.jpg

smartPrinter: Intelligent Functions and Intelligent Materials

Furthermore, you can access a wide selection of materials for all marking needs in control cabinets and benefit from fewer printing errors with automatic size adjustment.

Another benefit: Multi-line printable marking strips from WAGO help you organize the control cabinet more clearly – with 75 percent time savings over WMB Inline markers.

Another advantage: WAGO markings always stay clearly visible and legible – even after wiring.
That not only simplifies control cabinet assembly, but also makes them safer.

Your WAGO Contact

Vertrieb

Mon-Thu 8 am - 5 pm CET
Fri 8 am - 3 pm CET
Vertrieb_kontaktmodul_kundenservice_vertrieb_mann_gettyimages_482100240_400x346

Additional service offerings:

Discover the Next Process Phases

Process Phase 3

Assembly

WAGO provides you with custom rail assemblies or individual products – avoid order spikes while reducing storage and assembly costs with a delivery that occurs within just a few business days.

loesungen_schaltschrankbau_pozess_03_bestueckung_2000x1500.jpg