Avoid Faults and Gain Time by Using WINSTA®

The WINSTA® Pluggable Connection System provided safe and fast electrical installations during the relocation of the Swiss Post headquarters.
In 2015, the Swiss Post relocated their headquarters to Wankdorf City, a business park in Bern, Switzerland. The imposing new construction is located across the tracks from the new commuter train station in Wankdorf. Elektro Burkhalter AG, the company responsible for the electrical installations, relies on the WINSTA® Pluggable Connection System from WAGO – and with good reason.
In the future, this will be the city’s new office park; at the moment however, it is only a massive construction site. The land designated as Wankdorf City, in the northern part of Bern, will soon be home to the new headquarters of many organizations, including Swiss Federal Railways, Losinger Marazzi and the Swiss Post. The latter will move into an imposing building named “Majowa” at the start of 2015. With eight floors and 30,000 square meters, it offers space for 1,800 offices. The sheer size makes electrical installations particularly challenging. Lights, blinds, fire alarms, heating, ventilation, air conditioning, multimedia systems, door monitoring, access control, IT systems – they all require electricity and must be appropriately networked.
Swiss Post Headquarters
- Pressure Builds
- Planning is Decisive
- The Lights Go on in 2015